Steel structure fabrication and installation for a project „Shopping Center Havířov Na Kopci“ for a company NBS Invest a.s.
Fabrication: 30 tonnes
Installation: 73 tonnes
Production of 254 pieces of columns with side fits for noise barriers.
Weight: 85 tonnes
Steel structure installation for a project „Automatic Parking System, ČVUT – Czech Institute of Informatics, Robotics and Cybernetics -CIIRC“.
Weight: 89 tonnes
Production of steel bolts for a project „Stadium San Mames, Bilbao“ incl.surface treatment.
Weight: 42 tonnes
Disassembly, production and installation of steel structure incl. surface treatment for a project „CONVEYOR BELT 020 REPAIR IN AGGLOMERATION“ in the area of a company ArcelorMittal Ostrava a.s.
Weight: 120 tonnes
Disassembly, production and installation of steel structure for a project „Repair of the 1st and 2nd field of the bridge of conveyor belts P70 and P71 from the north in the area of a company ArcelorMittal Ostrava a.s.“ inlc. surface treatmet.
Weight: 55 tonnes
Steel structure delivery and installation of objects SO 503 and SO 504 for a project „Universal granulation line and ammonium nitrate“ in the area of a company LOVOCHEMIE a.s. – Lovosice inlc. surface treatment.
Weight: 137 tonnes
Fabrication of supporting steel structure for a project „Storage shed Autoneum CZ – Choceň“ incl. surface treatment.
Weight: 99 tonnes
Steel structure delivery of a taxiway for a project „Ore Crane Repair – AMO“ incl. surface treatment.
Weight: 136 tonnes
Steel structure delivery and installation for a project „Ventilation in a hall ALU 1“ and „Reinforcement of the roof of the northern outbuilding ALU2“ in the area of a company MAXION WHEELS, Ostrava-Kunčice incl.surface treatment.
Weight: 77 tonnes
Steel structure production of bridges, pylons and towers for a project „Equipment for cleaning“ incl. surface treatment.
Weight: 62 tonnes
Fabrication of supporting steel structure of columns, beams, stiffeners and wall constructions for a project „SYRA 4 PROJECT – PROCESS UNIT“
Weight: 185 tonnes
Delivery and assemvly of bridge steel structure for a project „VZT nové žíhací linky – ALUKOLA 1“ on the premises of the company Maxion Wheels Czech s.r.o. incl. surface treatment.
Weight: 24 tonnes
Delivery and assembly of steel structure for a project „Přístavba Bělírny C215“ on the premises of the company Mondi Štětí a.s. incl. surface treatment.
Weight: 38 tonnes
Fabrication of steel structure of supporting columns for a noise barrier wall..
Weight: 276 tonnes
Fabrication of steel structure for a project „Novostavba haly LARA SERVIS – Nitra“ incl. surface treatment.
Weight: 103 tonnes
Production of 10 pcs of crane runways, foot-bridges and handrails for a project „KW Staning – Erneuerung Kranbahn“ incl. surface treatment.
Weight: 122 tonnes
Assembly of supporting steel structure for a project „Obchodní centrum Na Kopci – Havířov“.
Weight: 115 tonnes
Delivery of steel structure of „Single purpose aids“ for a project „HOFOR BIO 4 – CYMIC BOILER“ incl. surface treatment.
Weight: 87 tonnes
Fabrication of bridge steel structure for a project „Přivaděč DN 500 Záhumenice – Bělá – rekonstrukce přívodního řadu, 1. etapa – havarijní řešení přechodu Odry“ incl. surface treatment.
Weight: 53 tonnes
Delivery and assembly of steel structure for a project „EcoFlex Etapa I.I.III – SO02.2 – Odparky“ on the premises of the company Mondi Štětí a.s. incl. surface treatment.
Weight: 95 tonnes
Production of supporting steel structure for a project „Penthaus – Deuna“.
Weight: 97 tonnes
Delivery and assemby of pylon steel structure for a project „BIGBOARD HYUNDAI“ incl. surface treatment.
Weight: 33 tonnes
Delivery of steel structure of secondary storage consele for a project „HOFOR BIO 4 – CYMIC BOILER“ incl. surface treatment.
Weight: 109 tonnes
Fabrication of supporting steel structure of pipe bridges for a project „PIPE RACK, NEXEN TIRE Czech republic“.
Weight: 104 tonnes
Assembly of bridge steel structure for a project „Feeder DN 500 Záhumenice – Bělá – reconstruction of the incoming order, 1st phase – emergency river Odra crossing“.
Weight: 53 tonnes
Delivery and assembly of steel structure for a project „Grammar school and Elementary school HELLO“ inlc. surface treatment.
Weight: 35 tonnes
Delivery and assembly of roof steel structure and trapezoidal sheets for a project „SIGMUND´s HIGH SCHOOL ENGINNERING LUTÍN – SCHOOL CAFETERIA MODERNIZATION“ incl. surface treatment.
Weight: 56 tonnes
Disassembly, delivery and assembly of steel structure for a project „CONSTRUCTION WORKS ON THE EXISTING LIME FURNACE“ on the premises of the company Mondi Štětí, a.s. incl. surface treatment.
Weight: 67 tonnes
Delivery of hall structure for a project „ASP Group – Store of motocycle goods and Sample workshop“ incl. surface treatment.
Weight: 238 tonnes
Delivery and assembly of hall steel structure for a project „HEMAT TRADE OSTRAVA, a.s. – Stock of metallurgical material“ incl. sheating and surface treatment.
Weight: 278 tonnes
Delivery and assembly of hall steel structure and trapezoidal sheets for a project „Sports Hall – Sokolovna Svinov“ incl. surface treatmanet.
Weight: 60 tonnes
Delivery and assembly of a building supporting steel structure and roofing steel structure for a project „BACKGROUND FOR VPP in Ostrava-Poruba“ incl. surface treatment.
Weight: 106 tonnes
Delivery and assembly of a steel structure under the boiler for a project „General Recovery and Greening ZEVO MALEŠICE – Heat Treatment of Waste” incl.surface treatment.
Weight: 244 tonnes
Production of supporting a steel structure for lower and upper floor for a project „Energy Gypsum Load for a Power Station Prunéřov”.
Weight: 53 tonnes
Delivery and assembly of a ramp steel structure for a project „Parking object ALPEX Ostrava“.
Weight: 54 tonnes
Disassembly, delivery and assembly of a hall steel structure for a project „Roofing of Sludge Field, SUEZ Frýdek-Místek“ .
Weight: 20 tonnes
Delivery and assembly of steel structure for a project „LEX AUTO TB Area, Authorized BMW Service” incl. surface treatment.
Weight: 69 tonnes
Delivery of steel structure of lower and upper part of a platform for a project „Sweden“.
Weight: 131 tonnes
Delivery of supporting steel structure for an object 05-10 for a project „Austria“.
Weight: 47 tonnes
Delivery of steel structure above the portal for a project „PS 01 – Equipment for sampling and processing of mixtures for the production of blast furnace agglomerates “ including surface treatment.
Weight: 116 tonnes
Delivery and assembly of steel structures under the boiler for a project „GENERAL RENEWAL AND ECOLOGIZATION of ZEVO MALEŠICE – HEAT TREATMENT OF WASTE“ including surface treatmet.
Weight: 255 tonnes
Supply of steel structures for a project “ Intensification of Z17 ŠKO-ENERGO treatment plants, Mladá Boleslav“ including surface treatment.
Weight: 30 tonnes
Production of steel structure of towers and platforms for a project „TURM 2“
Weight: 46 tonnes
Production of steel structure of towers and platforms for a project „TURM 5“
Weight: 37 tonnes
Delivery and installation of steel construction of the built-in for a project „GTB Staré Město“ including surface treatment.
Weight : 14 tonnes
Delivery and installation of steel structure and cladding of shipping malt tanks for a project “ Modernization of technological equipment in the malting plant in Hodonice“ including surface treatment.
Weight: 78 tonnes
Production of steel structure of towers and platforms for a project „TURM 1“
Weight: 32 tonnes
Production of steel structure of objects 01-03 for a project „NILL“
Weight: 23 tonnes