Delivery and assemby of steel structure for a project „Hall ROCKWOOL – 45m“ incl. surface treatment.
Weight: 32 tonnes
Production of secondary steel structure for a project „Airport Frankfurt“ incl. surface treatment.
Weight: 192 tonnes
Delivery and assembly of steel structure of walls and shelter for a project „JMB – STEEL“ incl. surface treatment.
Weight: 52 tonnes
Disassembly, production and assembly of steel structure of 2 pieces of fields for a project „Repair of the bridge structure of conveyor belts P70 and P71“ in the company premises Liberty Ostrava a.s. including surface treatment.
Weight: 58 tonnes
Delivery of supporting steel structure for a project „Germany – platform“ without surface treatment.
Weight: 47 tonnes
Delivery of supporting steel structure of towers for a project „OPTIMEX – Turm I and Turm II“ without surface treatment.
Weight: 55 tonnes
Delivery and control assembly of steel structure for a project „Formwork, Norway“ incl. surface treatment.
Weight: 83 tonnes